STAGING · DEMO DATA · TEAM REVIEW
Review vendor payments and station execution
Sign in / switch role · Vendor dashboard · VSSOps home
Connect over Tailscale and use the same review access key as port 3301. These are shared staging identities. Every vendor beginning DEMO · and every DEMO reference is fictional. Station names and IDs come from the copied VSSOps master; these allocations do not represent actual work.
Starting dashboard, 9 November 2026
- 5 bills pending settlement: ₹2,00,400, including ₹21,600 GST withheld.
- ₹1,78,800 eligible for payment; 4 overdue bills totalling ₹1,29,600.
- 3 unsettled advances: ₹65,000, including a partially allocated advance.
- 2 bills and 2 payment records awaiting approval, plus a survey and GST evidence.
These are starting values, not fixed targets. They change as your teams approve records, allocate payments, and return or consume materials. Existing review records have been retained.
What each team should try
| Sign-in role | Suggested review |
|---|
| Administrator / Project Manager | Check dashboard totals and vendor filtering. Review pending bills, payments, survey evidence in Approvals. Open a vendor ledger and export PDF or Excel. Approving your own submission is blocked. |
| Finance | Filter to DEMO · Rail Installation Services. Allocate part of its available advance to an approved bill and check that both outstanding and remaining advance decrease. Submit payments for Project Manager approval. Submit GST evidence as Finance, then switch to Finance 2 for independent GST approval. |
| Site Engineer | Open a DEMO station under Stations. Review its documents, request material or record installed/consumed quantities against an existing request. Commercial amounts are hidden for this role. |
| Stores | Open DEMO-T6-SITE for material awaiting consumption. Record a return against its request and check outstanding custody. Excess returns are rejected. Commercial amounts are hidden. |
Example vendors
- Rail Installation Services: overdue bills, partial payment, held/released GST, and two unsettled advances.
- Signal & Network Works: recovery with an allocated credit note, GST evidence awaiting review, signed Part A/B, and pending commissioning billing.
- Station Power Systems: a future-due bill, prework advance and material remaining in custody.
- Survey & Commissioning: survey and advance awaiting approval.
- Completed Projects: accepted work, all three milestones paid including verified GST, and fully reconciled material.
Generate a PO / WO
As Administrator / Project Manager, select Generate PO / WO. Choose a DEMO vendor, enter a new reference and address details, and review the prefilled MIC rate card. One station defaults to ₹52,000; SOR quantities start at zero pending approval. Edit quantities, rates, GST and issuer details, then use Preview PDF before Issue & download. Issued orders are frozen and their stored PDFs are available under Commercial.
New template orders follow 30% passive I&C, 20% active I&C, 20% camera I&C, 25% HOTO and 5% warranty. Existing demo orders retain their previous schedule. Camera completion requires signed material reconciliation; HOTO requires signed Part A/B, ABD and PAC. Warranty billing opens one year after PAC.
Import existing vendors and live POs
As Project Manager, open Commercial → Bulk upload vendors / POs. Download the CSV template, replace its example row, and save as CSV UTF-8. Import vendor master first, then POs using the same vendor codes. Validate and review all rows before importing; conflicts are reported and identical records are skipped. Each PO imports as a complete scope with its original date, reference, value and supported milestone schedule. Then use Commercial → Cutover balances & review for historical bills, payments, settlements, progress and opening custody. Select the cutover date, validate the CSVs and compare the resulting balances with your manual records. Submit as Manager; review financial/GST balances as Finance 2 and work/progress as PM1. Reviewers must differ from the uploader. Nothing posts until all required reviews are complete. Supporting station documents must be uploaded and approved first.
Feedback to collect
For each issue, note your role, vendor/reference, what you expected, what happened, and a screenshot if useful. Check whether the dashboard definitions match your reporting needs, whether approvals have enough evidence, and whether the material and payment flows match daily work.
Changes persist in this shared staging workspace. No production transactions are changed, and the app does not send WhatsApp messages or initiate bank transfers.